Key Quality Inspection Points for Each Process in Wire and Cable Manufacturing
Release time: 2026-09-16
I. Stranding Process
1.1 Prior to commissioning, perform a single-wire diameter inspection; the deviation of the single-wire diameter must remain within the process‑specified tolerance range.
1.2 Inspect the single‑wire surface quality: it shall be smooth, free of oil stains and severe mechanical damage, and the copper wire shall show no significant oxidation.
1.3 Inspect the selected pressure rollers, wooden molds, and steel molds to ensure they comply with process specifications.
1.4 Verify that the number of strands in the stranded conductor, the strand arrangement, the lay length, and the lay direction comply with the process specifications.
1.5 The geometric dimensions of the stranded, compacted conductor shall comply with the process specifications.
1.6 Inspect the conductor’s surface quality: it shall be compact and round, free from burrs or sharp edges that could damage the insulation, and without protrusions or broken individual strands.
1.7 Inspect the single‑wire connections; welding is mandatory, and the distance between any two connections shall be no less than 300 mm.
1.8 Inspect the ribbon cable for quality, ensuring it is flat, with no crossings or overlapping.
II. Insulation Process
2.1 Verify that the selected mold complies with process specifications.
2.2 Inspect the insulation thickness; the six-point average and the thinnest point shall comply with the process specifications.
2.3 Inspect the identification markings on insulated conductors: color-coded markings shall exhibit distinct, uniform colors; numeric markings shall be clear and abrasion‑resistant; and the marking on the finished cable shall be legible and continuous, with content conforming to process and planning requirements.
2.4 Inspect the insulation layer quality, ensuring proper plasticization, a smooth surface, and no bubbles, impurities, or cracks visible to the naked eye.
2.5 Inspect the extrusion quality, ensuring that the insulation layer is tightly extruded over the conductor, with no crushing, impact damage, bulging, loose wrapping, or wrinkling allowed.
2.6 Verify the implementation of the spark test; all insulated conductors must undergo the spark test, and the applied test voltage shall comply with process specifications.
2.7 Insulated conductor cores that have been punctured during the spark test must be rewound and repaired, and then subjected to a re‑spark test; otherwise, they shall not be released for downstream processing under any circumstances.
2.8 Inspect the ribbon cable for quality, ensuring it is flat and free of crossings or overlapping.
III. Shielding process
4.1 Inspect the number of copper tape winding layers, the winding direction, and the overlap ratio; these shall comply with the process specifications.
4.2 Inspect the wrapping quality, ensuring it is smooth and tightly compacted, with no wrinkles, curled edges, exposed core, or impact damage.
4.3 Inspect the welding quality of the copper strip; the copper strip joints must be welded.
4.4 Inspect the ribbon cable for quality, ensuring it is flat and free of crossings or overlapping.
IV. Cable Stranding Process
5.1 The arrangement, lay length, and twist direction of the insulated cable cores shall comply with the process specifications.
5.2 Inspect the specifications, dimensions, number of layers, and wrapping method of the wrapping tape to ensure compliance with process requirements.
5.3 Inspect the appearance quality after cabling; the wrapping tape shall be tightly applied, with no creasing, damage, or exposed strands. The filling shall be adequate, the cable’s outer surface round and uniform, and any out-of-roundness shall comply with process specifications.
5.4 Inspect the ribbon cable for quality, ensuring it is flat and free of crossings or overlapping.
V. Isolation Sleeve
6.1 Verify that the selected mold complies with process specifications.
6.2 Inspect the thickness of the isolation sleeve; the thinnest point shall comply with process specifications.
6.3 Inspect the external appearance of the isolation sleeve; it shall be round and smooth, with no signs of looseness, bulging, or leakage.
6.4 Inspect the ribbon cable for quality, ensuring it is flat and free of crossings or overlapping.
VI. Outer Sheath
8.1 Verify that the selected mold complies with process specifications.
8.2 Inspect the sheath thickness; the thinnest point shall comply with the process specifications.
8.3 Inspect the protective coating for quality; it shall be free from poor plasticization, scorching, bubbles, and impurities.
8.4 Inspect the outer jacket for appearance; the jacket shall be tightly extruded over the cable core, with a round and smooth surface, free from crushing, loose fitting, bulging, gaps in the jacket, or scratches.
8.5 Inspect cable identification markings; ensure that the lettering is clear and continuous, and that the content complies with process and planning requirements.
8.6 Verify compliance with the spark‑test procedure: the outer sheath of armored cables must undergo a spark test, and the test voltage shall conform to the process specifications.
8.7 Inspect the ribbon cable for quality, ensuring it is flat and free of crossings or overlapping.